No.1 |
Term of works shortening of working line of reinforced concrete assembly.
(about half of usual site assembly) |
|
No.2 |
The work efficiency leads to the reduction in the number of men well
by assembly in the factory. |
|
No.3 |
Because it is possible to work beforehand, the site installation is possible
by the few people. |
|
No.4 |
The number of men of the assistance of the site can be reduced. |
|
No.5 |
It is possible to carry efficiently because the reinforced concrete is folded
and it transports it. |
|
No.6 |
It is possible to work efficiently safely. |
|
No.7 |
A necessary temporary housing work stand for the field operation etc. can
be reduced. |
|
No.8 |
Because the majority can be assembled at the factory, the process can
be moved up. |
|
No.9 |
It is not ..becoming empty of the temporary putting space.. and ends because
it folds and it keeps it. |
|
No.10 |
The small reinforced concrete transportation decreases by the field
operation, and it is possible to work efficiently. |
|
No.11 |
The welding that is the cause of the section damage of the mother material
for the prefab unit making is needless. |
|
No.12 |
Because the material made a unit by uniting it ahead is brought in,
the site can be maintained in an orderly manner. |
|
No.13 |
The quality control improves for work factory C seeing Ta that the working
environment is comfortable, too. |
|
No.14 |
All unities of the entire material can be simply done. |
|
No.15 |
A new visitor by can the leveling of the number of workers of sites and
assistance, etc. can be reduced. |
|
No.16 |
The efficiency improvement when transported by folding in the union industrial
method a past factory ahead can be attempted. |
|
No.17 |
It is possible to correspond to the site of a severe term of works. |