Top page
The latest site report. Site Map Office Contact
Top Page Advantage of reinforced concrete Jabara unit construction. What is the reinforced concrete Jabara unit construction? Work procedure.
Comparison with conventional construction method. Quality Control Standard Code and process. The latest, local report list. Fixed automatic gas welding with pressure device for minute thing.
Reinforced concrete Jabara unit construction introduction corner
Nakatetu Ltd.
Construction place Osaka Prefecture Settsu City JAPAN
Special agent Nakatetu Ltd.
Main contractor name Takenaka Komuten Co., Ltd. and Toray construction cooperation enterprise
Construction building RC make warehouse
Construction part Underground beam and general floor beam
Amount of reinforced concrete 1650 tons
Construction date May, 2005
Article It adopted it from an underground beam to the general floor beam though it was a warehouse of the RC make.
The term of works can be greatly shortened and Ayu has expanded, too.
 ( It can see the expansion image by clicking the image. )
It can see the expansion image. It can see the expansion image. It can see the expansion image.
@
Union situation ahead
in factory
A
Fold situation in factory
B
Installation situation
in site
Reinforced concrete Jabara unit construction Catalog (15KB)
Adobe Acrobat Reader is free software developed and distributed by Adobe that lets you view and print PDF files. If Acrobat Reader has not already been installed on your computer, visit the Adobe Web site to download the necessary plug-in.
    ↑ Up
Privacy Policy Copyright Faq