Top Page Advantage of reinforced concrete Jabara unit construction. What is the reinforced concrete Jabara unit construction? Work procedure.
Comparison with conventional construction method. Quality Control Standard Code and process. The latest, local report list. Fixed automatic gas welding with pressure device for minute thing.
Reinforced concrete Jabara unit construction introduction corner
Iijima reinforced concrete industrial Ltd. No.2
Construction place Aichi Prefecture JAPAN
Special agent Iijima reinforced concrete industrial Ltd.
Main contractor name Kazama Gumi.
Construction building Aisero Chemistry new ALC construction work
Amount of reinforced concrete 42 tons
Construction date 2005
Article The base and the pillar part of the industrial method iron frame make without an underground beam main stripe fitting in Jabarayunit were lost, and Fcashi and the gorge size were secured, a complex distribution muscle in the pillar was lost, and all the fitting parts were lost in the span. One industrial sector was achieved, and even the difference muscle work would be completed in two days, and a marvelous term of works was achieved.
 ( It can see the expansion image by clicking the image. )
It can see the expansion image. It can see the expansion image. It can see the expansion image. It can see the expansion image.
@
Base distribution
muscle situation
A
Situation
in Fcashi part
B
Section
in Fcashi part
C
It unites it the beam
part ahead.
Restoration situation
of unit
It can see the expansion image. It can see the expansion image.
D
Storing situation
of Fcashi
E
Distribution muscle
completion
Reinforced concrete Jabara unit construction Catalog (15KB)