|
|
|
|
|
Reinforced concrete Jabara unit construction introduction corner
Shinwa industry Ltd. No.1 |
|
|
| Special agent |
Shinwa industry Ltd. |
| Main contractor name |
Ueki Gumi. |
| Construction building |
Kashiwazaki Ecserancort |
| Amount of reinforced concrete |
620 tons |
| Construction date |
2006 |
| Article |
The photograph where the reinforced concrete Tsme bend machine was produced, and constructed by itself.
As a result, Fupstarapp of 135 degrees in both Tsme angle can be easily
bent.
The weight of the machine can correspond to D10-16 during about 10kg and three seconds in the bend time.
|
|
|
|
| ( It can see the expansion image by clicking the image. ) |
 |
|
 |
@
It assembles it at the factory. (base part of pillar) |
|
A Fuptsme bend situation
|
|
|
|
 |
 |
|
B
Photograph of the entire machine |
C
After the bend |
|
|
|
|
|
|
Reinforced concrete Jabara unit construction Catalog (15KB) |
|
 |
|
Adobe Acrobat Reader is free software developed and distributed by Adobe that lets you view and print PDF files. If Acrobat Reader has not already been installed on your computer, visit the Adobe Web site to download the necessary plug-in. |
|
|
| ↑ Up |
|
|
|
|
|