|
|
|
|
|
Reinforced concrete Jabara unit construction introduction corner
Shinwa industry Ltd. No.2 |
|
|
| Construction place |
Niigata Prefecture |
| Special agent |
Shinwa industry Ltd. |
| Main contractor name |
Ueki Co., Ltd. |
| Construction building |
Kashiwazaki Ecseran Cort |
| Amount of reinforced concrete |
620 tons |
| Construction date |
November, 2006 |
| Article |
The Otets part is floated by making the pillar muscle the pillar of setting up the first floor and the pillar of setting up the second floor in each floor. I got the floated pressure touching part from Mr. general contractor as a technology fee.
|
|
|
|
| ( It can see the expansion image by clicking the image. ) |
|
 |
|
 |
|
 |
|
 |
@
Pillar unit unloading scenery. |
|
A
It is a temporary putting on the slab. |
|
B
Confirmation of unit. |
|
C
Hanging crowding. |
|
 |
|
 |
|
 |
|
 |
C
Hanging crowding.
|
|
D
Pressure touching machine and tool installation work. |
|
E
Vertical confirmation of pillar unit. |
|
 |
|
 |
|
 |
|
 |
E
Vertical confirmation of pillar unit.
|
|
F
Pressure welding. |
|
G
Pressure touching end. |
|
|
|
|
|
|
Reinforced concrete Jabara unit construction Catalog (15KB) |
|
 |
|
Adobe Acrobat Reader is free software developed and distributed by Adobe that lets you view and print PDF files. If Acrobat Reader has not already been installed on your computer, visit the Adobe Web site to download the necessary plug-in. |
|
|
| ↑ Up |
|
|
|
|
|