Top Page Advantage of reinforced concrete Jabara unit construction. What is the reinforced concrete Jabara unit construction? Work procedure.
Comparison with conventional construction method. Quality Control Standard Code and process. The latest, local report list. Fixed automatic gas welding with pressure device for minute thing.
Reinforced concrete Jabara unit construction introduction corner
Takeda construction Ltd.
Reason taken up It was a site of S make with which a whole term of works was severe, and the term of works shortening of 20 days by the foundation work was requested. From design to first Doropphanti (The width of the beam of the edge of an underground beam is growing) the shape of an underground beam, and a suitable structure of the class beam for the class industrial method drop possible ahead in Doropphanti ahead moreover.

Special agent Takeda construction Ltd.
Construction building Dream town Takamatu Honten Additional construction
Amount of reinforced concrete 96 tons
Construction date June 20, 2006 from February 20, 2006
Article It was a situation in which shortening the term of works of 20 days was not able to be hoped in the conventional construction method though did the Indian ink putting out after Stecon was placed, and became reinforced concrete construction on a usual site. (Among the contract amount 96t, the term of works of about two weeks every 60t of the amount of a basic reinforced concrete and 8 people is necessary. )

 ( It can see the expansion image by clicking the image. )
No.1 The spot is welded and St of FG Doropphanti is made a unit.
No.2 The center part of FG is made Jabarayunit.
      (Early assemble it by using the unity line with rubber. )
 
It can see the expansion image. It can see the expansion image.
Spot welding of St at factory FG is made Jabarayunit.
It can see the expansion image. It can see the expansion image. It can see the expansion image.
@
Base distribution muscle
A
Doropphanti unit ST set
B
FG Jabara causing
It can see the expansion image. It can see the expansion image. It can see the expansion image.
C
FG Jabara hanging crowding
D
Upper width stop putting away
[ Summary ]
・ It is very effective for the site in which it aims at reduction in costs depending on the site and the term of works shortening with which the term of works is severe.
・ A structural change is difficult on the way if Doropphanti is not adopted in the original design.
・ The use frequency of the crane increases and heavy ability is needed though a great term of works shortening can be expected for the reinforced concrete construction.
・ It seems that this industrial method is effective on the site with the number of stories such as sites and apartment houses where the foundation work such as factories is the main.