|
|
|
|
|
Reinforced concrete Jabara unit construction introduction corner
Ideguchi reinforced concrete externals Ltd. No.3 |
|
|
| Work place name |
The fifth SUMCO crystal factory newly-built construction |
| Construction |
The Shimizu Construction. Design Mitsubishi Materials Corporation. |
| Construction place |
Saga Prefecture |
| Amount of reinforced concrete |
400 tons |
| Article |
After an underground beam is assembled, the Fcashi muscle is installed usually. However, the class unit was produced at the destination of combining an underground beam with the Fcashi muscle because there were 1m Fcashi back this time, and the beam and the Fcashi muscle were constructed at the same time. It became a great decrease of a past term of works and the reinforced concrete
assembly artificial by this method.
|
|
|
|
| ( It can see the expansion image by clicking the image. ) |
 |
|
 |
|
 |
@
Site carrying. |
|
A
Unit causing. |
|
 |
|
 |
|
 |
B
Site causing and unity scenery of class unit ahead. |
|
C
Independence scenery of class unit Jabara ahead. |
|
 |
|
 |
|
 |
D
It is scenery hanging on a prescribed position and crowding. |
|
E
Spasaing paving crowding and Cabri making reinforced concrete unity scenery. |
|
F
Extrusion muscle distribution muscle and fitting work. |
|
 |
|
|
|
|
F
Extrusion muscle distribution muscle and fitting work. |
|
|
|
|
|
|
|
|
|
|
Reinforced concrete Jabara unit construction Catalog (15KB) |
|
 |
|
Adobe Acrobat Reader is free software developed and distributed by Adobe that lets you view and print PDF files. If Acrobat Reader has not already been installed on your computer, visit the Adobe Web site to download the necessary plug-in. |
|
|
| ↑ Up |
|
|
|
|
|