| Special agent |
Etani Reinforced concrete. |
| Site name |
Minamimorimachi Shinohara |
| Construction place |
Osaka City |
| Design company |
ART architect's office Ltd. |
| Main contractor company |
Obayashi Gumi |
| Amount of total of reinforced concrete |
266 Ton |
| Industrial method use part |
Pillar |
| Article |
This photograph is a pattern of the pillar assembly with the top
floor corner part hook.
Hashirasom constructed the feature of this site from a usual floor
height high by the Jabara industrial method.
The term of works and the efficiency of assembly Ayu went up.
|
| Comment |
Obayashi Gumi ShinoharaMInamimorimachi Building work Head Maekawa Hideo
The first time in this Jabara unit construction IWhen execution is seen, I think it is very good for this site. As for this site, the floor height is feared in safety in the situation in which there are accidents in the assembly of the work stand higher than usual sites and the work stand liaison cannot be taken. It is an industrial method where only the crane work only has to pay attention, and it wants to adopt efficiency well in the future. However, it is regrettable that the crane doesn't reach the whole from circumstances of the site. |