| ( It can see the expansion image by clicking the image. ) |
 |
|
 |
|
 |
|
 |
No.1
It is a class situation in the factory ahead. |
|
No.2
The anchor assistant unit is being assembled. |
|
No.3
Accumulation situation in processing hall. |
|
No.4
Assembly situation of base with hook. |
|
 |
|
 |
|
 |
|
 |
No.5 Accumulation situation in processing hall. |
|
No.6
It is a situation hanging in the site and crowding. |
|
No.7
State of assembly. |
|
No.8
It is a causing situation in the site as for Jabarayunit. |
|
 |
|
 |
|
 |
|
 |
No.9
State of unity. |
|
No.10
It is a situation hanging and crowding. |
|
No.11
Beam unit installation situation.
(It reinforced it until the fitting work ended in the fall prevention by
the Tal
tree because Harisom was high.) |
|
 |
|
 |
|
 |
|
 |
No.11
Beam unit installation situation. |
|
No.12
Main stripe fitting work.
(A main stripe collaboration position was moved to an alternate 500milli. ) |
|
No.13
Site work situation. |
|
No.14
State of all end of works. |
|