No.1
The entire assembly yard scenery. |
|
No.2
Beam muscle assembly situation. |
|
No.3
Class situation pillar ahead. |
|
 |
|
 |
|
 |
|
 |
No.3
Class situation pillar ahead. |
|
No.4
Accumulation sunshade care. |
|
 |
|
 |
|
 |
|
 |
No.5
Transportation. |
|
No.6
Site bringing in. |
|
No.7
Concrete block with unity line. |
|
No.8
It blocks and it unites in the muscle under the beam beforehand. |
|
 |
|
 |
|
 |
|
 |
No.9
It installs it with the crane after the installation of the block. |
|
No.10
Jabarayunit is sequentially installed from the direction of the vicinity
of length. |
|
No.11
It takes care of one's health to the collapse prevention by the steel pipe
and clamping. |
|
 |
|
 |
|
 |
|
 |
No.12
Length near direction end. |
|
No.13
Unit installation situation in direction of the short vicinity. |
|
No.14
Pillar muscle loading and transportation situation. |
|
 |
|
 |
|
 |
|
 |
No.14
Pillar muscle loading and transportation situation. |
|
No.15
The site is carried, and it puts it. |
|
No.16
Pillar causing work.
|
|
 |
|
 |
|
 |
|
 |
No.16
Pillar causing work. |
|
No.17
Fitting work. |
|
 |
|
 |
|
 |
|
|
No.17
Fitting work. |
|
No.18
Pillar completion of assembly. |
|
|