| Reinforced concrete construction company |
Industry Ltd. of Yamaguchi reinforced concrete. |
| Main contractor name |
Sato Kogyo, Terasaki industry, and Shiotani construction JV. |
| Construction place |
Hashanage municipal management house Ta business of Toyama Prefecture. |
| Design |
Soukenchiku office. |
| Amount of reinforced concrete |
About 650 tons. |
| Article |
The thing and the beam that had had to be constructed by the delay of the
confirmation application in a short term constructed it for the first time
by the Jabara unit construction with 1800milli this time because it was
large.
It was felt that it was possible to use it for the class by the color work
ahead though it constructed for the first time and it was at first puzzled.
The term of works and assembling both artificial has decreased.
ndustry Ltd. of Yamaguchi reinforced concrete.
Yamaguchi president.
|